“Frame” is constructed by contractor from concrete and curb angle set.
Pit has a console (±610mm below level) which supports the rear frame of the leveller.
Forces of the leveller are absorbed by curb angles with anchors, casted in the concrete.
Leveller comes in low transport height.

±2-hour installation time
After installing the leveller, it can be used at once.
