The frame is constructed by contractor from concrete and curb angle set.
Pit has an intermediate floor (±610mm below level) which supports the rear frame of the leveller.
Forces of the leveller are absorbed by curb angles with anchors, casted in the concrete.
Leveller comes in low transport height.

±2-hour installation time; After installing the leveller, it can be used at once.